our process

five stages,
no surprises _riba stages 0 to 4 in plain english. architectural design in leeds, led by a registered architect: what happens at each stage, how long it takes, and what you are holding at the end of it.

book a consultation visitget your free report_

your journey with we are _, stages 0 to 4

the riba plan of work splits a project into stages. we take you through 0–4, from the first site visit to a technical package a builder can price, and we'll tell you honestly where you are at every step.

riba stage 0–1

consultation visit

every great project starts with a conversation.

andrew and jack come to you. we'll walk the site, hear what you're hoping to do, and tell you straight what we think is possible, no jargon, no sales pitch. we want to understand the brief, the budget and the ambition before we say much at all. after the visit you get a written summary of the brief, a first read on the site, and what we'd suggest doing next. it costs nothing, and you'll know quickly whether we're the right fit.
Sandstone Victorian villa in Roundhay, Leeds, seen from the drive before work began — the kind of house a first consultation visit starts with
first visit · roundhay
you’ll have

a written summary of your brief, a first read on the site, and what we’d suggest doing next.

roughly

one visit of about an hour, then a few days for the write-up.

it costs

nothing. you’ll know quickly whether we’re the right fit.

riba stage 1

feasibility study

testing your ideas against reality.

this is where we put your brief under pressure, against the site's orientation, planning policy, structure and budget, and come back with sketches and diagrams showing what could work, and why. it's not about finding problems; it's about finding the best route through. if part of the brief needs a rethink, now is the cheap time to find out. things caught here save money later, and usually make the finished building better.
Feasibility sketch drawn over a floor plan on an iPad by we are _, Leeds
feasibility sketch · leeds
you’ll have

sketch options and diagrams for every route we think is worth testing.

roughly

two to three weeks from the consultation visit, depending on the site.

your decision

which direction goes forward to concept design — yours, on the evidence.

“we are _ listened to what we wanted and despite dealing with a tricky layout for the upstairs bathroom they came up with a solution.”jennifer · verified google review

riba stage 2

concept design

where the project finds its character.

we take the strongest feasibility direction and work it up properly: cad drawings, 3d models, photorealistic renders, sometimes a physical scale model. you'll see the project before a single brick is laid. we'll show you alternatives and explain our thinking as we go, there's room for your input at every step. we're after a design that solves the brief and still manages to surprise you.
Watercolour concept view of a house extension in Wetherby, North Yorkshire, by we are _
concept watercolour · wetherby
you’ll have

cad drawings, 3d models and photorealistic renders — sometimes a physical scale model.

roughly

three to five weeks, with review points built in along the way.

your decision

the design that goes to planning.

“they listened to my ideas, discussed them in great detail and put forward alternatives to consider.”rob · verified google review

riba stage 3

detailed design & planning

getting everything ready for the planning authority.

stage 3 pulls everything together into a complete planning submission, elevations, site plans and the supporting documents the council asks for. the statutory consultation runs at least 8 weeks, and we use that time to get you ready for the technical stages ahead. we manage the submission, deal with the planners, and keep you posted throughout. it's the last design milestone before construction, we like to get it right.
Planning drawings for a householder application — elevations and site plan by we are _
planning drawings · householder submission
you’ll have

a complete planning submission: elevations, site plans and the documents the council asks for.

roughly

statutory consultation runs at least 8 weeks once we submit.

we handle

the submission and the planners, and we keep you posted throughout.

“i can see there was a tremendous amount of work and thinking gone into this… i can picture it all, it's just lovely. thank you so much for taking the time to take care of this with pride.”gurdeep · verified google review

riba stage 4

technical design

turning an approved design into something a builder can price and build.

with planning consent in hand, we produce the full construction package: structural coordination, building regs drawings, material specifications, room-by-room schedules, everything your builder needs to price the job properly and build it as drawn. stage 4 also covers procurement, finding the right contractor, running a tender, and going through the quotes with you. we don't hand over the drawings and vanish; we stay involved so the design intent survives contact with site.

building regulations application

full br submission, structural drawings, thermal calcs, fire strategy, drainage, managed by us from start to approval.

technical construction drawings

a coordinated package of plans, sections, elevations and details your contractor can build from without guesswork.

specification & schedules

written specifications for every material, finish and fitting, from external cladding down to the door handles.

design presentation

before anything goes to tender, we sit down with you and go through the full stage 4 package, every detail, every question, then sign-off.

contractor procurement

we help you find the right builders, run the tender, compare the returns, and advise on who to appoint.

“andrew and jack are easy to deal with, friendly and supportive.”rob · verified google review

stage 5, construction _

once the technical package is approved and a contractor appointed, the project moves on site. we stay on as your architect, visiting regularly, answering the builder's queries, checking progress against the drawings, and making sure what gets built matches what was designed.

stages 5 and 6 cover construction and handover, we do those too. get in touch and we'll walk you through the full picture.

ask us about stage 5 _
05

construction on site

regular site visits, quality checks, and contractor support throughout the build.

06

handover & close-out

snagging, as-built documentation, and checking everything is as designed.

07

in use

we check back in once you've lived with it, to see how the building is actually performing.

→

the full journey

from first sketch to handover, we can take a project all the way.

useful tools

fee calculator _

a quick estimate of architectural fees across the riba stages, residential or commercial.

calculate my fees →

start a project _

ready to get going? fill in the new project form and one of us will reply within 2 working days.

begin the form →

our services _

everything we offer, listed plainly, from feasibility studies to contract administration and interiors.

view services →

your custom project
feasibility report _

answer seven short questions and we'll put together a report for your project: likely timescales (including the 8-week planning period), a budget sense-check, and anything about your site worth knowing early. andrew or jack reads every one before it goes out.

question 1 of 70%

what type of project are you planning?

choose the option that best fits, don't worry if you're not sure yet.

google review · 5 stars

"we used we are_ for an extension and garden building that we'd been planning and dreaming about for approx 8 years. from concept to creation, jack and andrew have been wonderful. they've pushed our creative boundaries and together we've created something 'out of the norm'.

verified google review · ★★★★★

in their words

"andrew and jack are easy to deal with, friendly and supportive."

rob

"we are _ listened to what we wanted and despite dealing with a tricky layout for the upstairs bathroom they came up with a solution."

jennifer

"i can see there was a tremendous amount of work and thinking gone into this… it's just lovely. thank you so much for taking the time to take care of this with pride."

gurdeep

common questions

What should I ask my architect when we first meet?

Ask who will actually do the work. With us it is one of the two directors from start to finish, never an account manager. Ask how they charge and what each fee covers, whether they have dealt with your local planning authority before, and how long a project like yours usually takes. Ask to see similar work they have built. It is also fair to ask what they would do with your site.

What are RIBA stages 0–4, in plain English?

They are the standard steps of a project. Stages 0 and 1 cover what you need and whether it is feasible. Stage 2 is the concept, the main idea. Stage 3 develops it and takes it through planning. Stage 4 is the technical drawings your builder needs to price and build it. We take every project through all of them.

How long does a typical project take?

It depends on size and planning. As a rough guide, feasibility and concept take a few weeks, a householder planning decision takes about eight weeks once it is submitted, and technical design follows on. A simple extension is usually a few months from first sketch to being ready to build. New-builds and listed work take longer.

Do I need planning permission?

Often not. A lot of extensions fall under permitted development, though it depends on your property, its size, and whether you are in a conservation area or the building is listed. We will tell you which applies to you at the first visit rather than guess.

ready to start something
worth building?

you'll deal with the same two people from first sketch to handover, and we'll care about it more than is strictly professional. say hello.